Committed to improved levels of process management
At Middlesex Aerospace we are totally committed and focused on continuously improving throughput. From stock and work-in-progress reduction to improvements in Cost of Non Conformance and OEE, our dedication to increasing productivity and workplace efficiency allows us to support higher levels of service and deliver quality and DSA to our customers.

Vendor Managed Solutions – Kitting
At every stage of the supply chain we are constantly striving to increase workflows to improve stock control efficiency to achieve 100% on-time delivery. Keeping stock levels down to an absolute minimum is crucial to an integrated and efficient system.
The vendor managed solution is located with the customer so an engineer can remove stock beside the assembly line. This then triggers the software to email a release note and an invoice is raised within seconds.
This highly efficient and integrated approach to source and supply, enables us to ‘vendor manage’ the complete solution.
Further Reading
Engineering Apprenticeship Scheme
My apprenticeship Working within key areas of the business I gathered a wealth of information and experience: Goods in Inspection Main inspection Tool room Jet
Customized Kitting of the A320 Damper Unit
Challenge To introduce a proactive lean initiative which will optimise the flow of products to the production line. Drive multiple process improvements within the inventory



